Roadway Improvement Projects

Transportation Improvement Projects

The City of Lino Lakes' transportation system is managed by a number of agencies depending on the type of roadway. The City is responsible for the local and collector street system such as Elm Street or Holly Drive. Anoka County and Ramsey Counties have jurisdiction over arterial streets such as Lake Drive, Main Street, Hodgson Road and Ash Street. The Minnesota Department of Transportation is responsible for operation of Interstates 35E and 35W. City staff works with each of these agencies to develop and deliver transportation improvements.

 Lino Lakes has a number of transportation projects in various stages of development. 

Click the links to learn more about each project.

Under Construction

  • County Road J & I-35E Interchange (Ramsey County)
    • Traffic Impacts - starting August 4, 2025

      • County Road J and Centerville Road next to the gas station will be closed beginning August 4. 

      • Follow posted detours (yellow dotted line in image), there is no traffic through the intersection of Centerville Road and County Road J next to the gas station. 

      • Driveways on Centerville Road and County Road J for the Theater Shops, gas station, and restaurants will be open.

Detour map image of Cty Rd J and I-35E

  • 2025 Trail Maintenance Project (Update Sept. 9)
    • The trail between W Shadow Lake Drive and Fawn Ln will be closed intermittently over the next two weeks for maintenance. View map.
  • 2025 Street Reconstruction Project (Lino Lakes)
    • Pine Haven neighborhood 81st Street, Elbe Street, Danube Street
    • Colonial Woods neighborhood Red Maple Lane
    • Overlay of Diane Street and Evergreen Trail
  • 2025 Street Rehabilitation (Mill and Overlay)
    • The project includes pavement resurfacing (mill and overlay) and gate valve replacement on the following roadways:
      • Coyote Trl and Ct
      • Fawn Ln (south of Birch), Beaver Trl, and Muskrat Run
      • E. Shadow Lake Ct, White Birch Ct, and Red Birch Ct 
      • Linden Ln
      • Red Hawk Trl
    • The project also includes a thin overlay of the following streets:
      • Orange St, Eva St, Olive St, and Maple St

Project Update (September 10, 2025)

The 2025 Rehabilitation Project is substantially completed. Please reach out to the construction inspector with any questions or concerns.

  • Market Place Drive Realignment Project
    • The project includes realigning 77th St W between Marilyn Drive and Lake Drive so that 77th Street aligns with Market Place Drive at Lake Drive.

Project Update (September 10, 2025)

  • The Market Place Drive Realignment Project is substantially completed. Please reach out to the construction inspector with any questions or concerns. Further construction for the development will continue following the city project.

Construction Inspector information: Jordan Brelje - 651-421-1620

Active Design

The projects listed below are projects where engineering design is underway and project is proposed for construction. Current Projects include (Project lead agency in bold italics):

Transportation Studies

The City has coordinated with Anoka County to prepare multiple transportation plans for County Roads. These plans provide an overall plan for a corridor which may result in the development of one or more projects as funding becomes available. Current plans include (Project lead agency in bold italics):